Production Deployment: Production Checklist
Production Deployment: Production Checklist
Part of: Production Deployment Guide
11.1 Pre-Deployment Checklist
Infrastructure:
- VPC/Network configured with appropriate CIDR blocks
- Subnets created across multiple availability zones (minimum 3)
- Security groups configured with least privilege access
- NAT Gateway/Internet Gateway configured
- VPN/Direct Connect established (if hybrid deployment)
- DNS zones created and configured
- Load balancers provisioned and tested
- SSL/TLS certificates obtained and installed
- KMS keys created for encryption
- S3 buckets created for backups
Kubernetes Cluster:
- Cluster created with appropriate version (1.28+)
- Node groups configured with correct instance types
- Auto-scaling configured (HPA, VPA, Cluster Autoscaler)
- Storage classes defined
- CSI drivers installed
- Monitoring stack deployed (Prometheus, Grafana)
- Logging stack deployed (ELK, Fluentd)
- Network policies configured
- Pod security policies/standards enforced
- RBAC roles and bindings created
HeliosDB Configuration:
- Configuration files reviewed and validated
- Secrets created and encrypted
- Resource limits defined appropriately
- Replication factor set (minimum 3)
- Backup schedule configured
- Monitoring and alerting rules configured
- TLS certificates configured
- Authentication methods configured
- Authorization policies defined
- Performance tuning parameters set
11.2 Post-Deployment Checklist
Validation:
- All pods running and healthy
- Service endpoints accessible
- Health checks passing
- Database connectivity verified
- Replication working correctly
- Backups completing successfully
- Monitoring dashboards showing data
- Alerts firing appropriately (test)
- Logs being collected and stored
- Performance benchmarks run
Security:
- TLS encryption verified
- Authentication working
- Authorization policies effective
- Network policies enforced
- Secrets properly encrypted
- Audit logging enabled
- Vulnerability scan completed
- Penetration testing scheduled
Documentation:
- Runbook created and reviewed
- Architecture diagrams updated
- Configuration documented
- Backup/restore procedures documented
- Incident response plan created
- On-call rotation established
- Training completed for operations team
11.3 Go-Live Checklist
Pre-Go-Live (1 week before):
- Load testing completed successfully
- Disaster recovery tested
- Backup and restore tested
- Monitoring and alerting validated
- On-call team trained and ready
- Rollback plan documented and tested
- Communication plan established
- Stakeholders notified
Go-Live Day:
- War room established
- Monitoring dashboards open
- On-call team available
- Database migration completed (if applicable)
- Application cutover executed
- Traffic gradually ramped up
- Metrics monitored continuously
- Issues logged and tracked
Post-Go-Live (24 hours):
- System stability verified
- Performance metrics reviewed
- Error rates within acceptable limits
- User feedback collected
- Issues resolved or escalated
- Post-mortem scheduled (if needed)
- Documentation updated